Motor-powered beam grab with two-crane suspension

Lifting of rails

When dismantling tracks, the lifting equipment travels over the tracks that are still in place at the correct gauge and grasps the front and end of each rail with two individual grabs. The four individual grabs then simultaneously move parallel to the centre of the lifting equipment in order to lift the second and third sets of rails. All 6 rails are then moved to a storage location, where they are sorted and placed next to each other. This sequence can be reversed to lay tracks.

 Application:
Lifting of rails
 


 Details:
The lifting equipment grabs up to 6 individual rails in succession
 
telephone

Callback service

Quick and easy to get in touch with us. We call you back!

Please call me back